• Register
  • Login
  • فارسی
Monenco Iran
  • Home
  • Sectors
    • Power Generation
      Power Transmission Lines
      Dispatching and ICT
      Oil & Gas
      Water and Wastewater
      Railways
      System & Energy Studies
      Management Consultancy
      Research and Development
  • About Us
    • Introduction
      History
      Vision and Mission
      Certificates
  • Management & Organization
    • Message From Managing Director
      Organization Chart
      Monenco Overseas
      Former Directors
      Local Companies and Regional Offices
  • News and Media
    • News
      Technical Reports
      Books
      Annual Reports
      English Newsletter
      Brochures
  • Join us
    • Job opportunities
      Suppliers
  • Contact us

Projects


All Projects
Power Generation
Power Transmission Lines
Dispatching and ICT
Oil & Gas
Railways
Water and Wastewater
System & Energy Studies
Research and Development
Management Consultancy

Feasibility Study of Iran and Oman Grids Interconnection

Feasibility Study of Iran and Oman Grids Interconnection

3 Years Framework Agreement with OETC for Power System Studies

3 Years Framework Agreement with OETC for Power System Studies

 Synchronous Interconnection of Iran-Iraq Grids

Synchronous Interconnection of Iran-Iraq Grids

 Reliability Study of Bangladesh Power Grid System

Reliability Study of Bangladesh Power Grid System

 Operating Reserve Management in MIS and Dhofar systems of OETC

Operating Reserve Management in MIS and Dhofar systems of OETC

 Power Evacuation System Studies for Salalah Power Plant (IPP-2)

Power Evacuation System Studies for Salalah Power Plant (IPP-2)

Synchronous Interconnection of Iran-Iraq Grids

Synchronous Interconnection of Iran-Iraq Grids

 Development of a Master Plan for TREC Transmission Network (2014-2024)

Development of a Master Plan for TREC Transmission Network (2014-2024)

 Detailed design of rules and tools for day-ahead spot market pricing

Detailed design of rules and tools for day-ahead spot market pricing

Reorganizing the structure of Iran Electricity Supply Industry

Reorganizing the structure of Iran Electricity Supply Industry

 Feasibility Studies for Localization of Phase Shifting Transformer (PST)

Feasibility Studies for Localization of Phase Shifting Transformer (PST)

 Application of Flexible AC Transmission System (FACTS)

Application of Flexible AC Transmission System (FACTS)

Iran Electricity Market Dispute Resolution Management System - ADR (Alternative Dispute Resolution)

Iran Electricity Market Dispute Resolution Management System - ADR (Alternative Dispute Resolution)

     
  • 1
  • Related Links

    • eMonenco
    • Organization Emails
    • Feedback
    • Digital Library
    • Related Companies
  • Contact us

    • Address: No. 12 Attar st., Valiasr Ave., Tehran – Iran
    • Zip Code: 1994643315     P.O. Box: 15875-8717
    • Tel: +98 21 81961     Fax: +98 21 88771206
    • Email: info@monencogroup.com
    • Social Networks:
    • monenco map
Designed By: MIR.co | 2017 © Monenco, All rights reserved
All Site Content is reserved for Monenco Iran.