3 Years Framework Agreement with OETC for Power System Studies

3 Years Framework Agreement with OETC for Power System Studies

Start Date: 2015

Finish Date: 2018

Location: Muscat, Oman

Client: OETC (Oman Electricity Transmission Company)

 

Scope of Services:

  • Dispatch scenario when any new power plant connects to the system
  • Operational effects of new major loads connected to the system
  • Economic dispatch requirements
  • Spinning reserve management
  • Under frequency settings
  • Islanding procedures
  • Black start procedures
  • Preparation and modification of system Operation Procedures
  • System operation studies
  • Study the system behavior for any new connection
  • Study the difficulties in the international connection
  • Study the voltage issues in winter time
  • Study the major incidents and partial blackouts
  • Help to prepare the contingency plan
  • Advice for real time operation
  • Study n-1 criteria by modeling the network system
  • Study the PDO-MIS and PDO-Dhofar connections

• Risks of the interconnection
• Risk of inter-area oscillations
• Specific issues linked to energization (overvoltage, resonance)
• Tuning of system protections to face emergency conditions like loss of synchronism, evaluation of maximum power transfer


Description:

As preferred consultant for all operating requirements in 3 years of OETC and wide projects in operating fields show the capabilities of Monenco in system studies.