Application of Flexible AC Transmission System (FACTS)


Title: Application of Flexible AC Transmission System (FACTS)
Start Date: 2010
End Date: 2011
Client: Iran Generation & Transmission Company (TAVANIR)
Main Client: Iran Generation & Transmission Company (TAVANIR)
Location: Iran's 230 & 400 kV Transmission Network
Scope Of Work:
• Grid Modeling
• Load Flow and Stability Studies
• Identifying Weak Spots of the Grid
• FACTS Localization and Studies
• Technical & economical evaluation
Details:
Application of Modern Controllers in Iran Transmission Grid
Improvement of Static Operation of the network
Improvement of Grid Stability
Replacement for Investments in Transmission Infrastructure Expansion