Start Date: 2020
End Date: 2021
Client: Khuzestan Regional Electric Co. (KZREC)
Main Client: Khuzestan Regional Electric Co. (KZREC)
Location: Ahvaz– Khuzestan Province, Iran
Scope of Work:
Description:
The emerging phenomenon of dust haze has affected many Infrastructural industries during the past few years, and it has led to numerous problems for power grid such as transmission and sub-transmission lines and substations equipment as well.
These problems impress daily life by causing disturbance in electrification. Therefore, the issue should be considered from three aspects as bellow:
Therefore, Tavanir Co. in charge of Iran Power Grid defined a national plan of improving stability and reliability of power grid against Haze Phenomenon and assigned Khuzestan Regional Electric Co. (KZREC) on behalf of Power Grid to perform it in collaboration with 5 Regional Electric Companies which are involved in Haze Phenomenon.
In this regard, and based on the valuable experiences of Monenco Iran, the consultancy services of the project was awarded to Monenco Iran.