Engineering services, site supervision, additional detailed studies, exploration drilling of water, mining of Mazino I coal mine in Tabas area


Title: Engineering services, site supervision, additional detailed studies, exploration drilling of water, mining of Mazino I coal mine in Tabas area
Start Date: 2001
End Date: 2007
Client: Iran power development organization and Iranian mineral production and supplying Co.
Main Client: Iran power development organization and Iranian mineral production and supplying Co.
Location: Tabas
Scope Of Work:
Monenco Iran works with clients to execute geology studies, investigate new mines or improve the operations of existing mines with a primary focus on safely achieving optimum output and return on investment. Our people bring a business perspective to the technical challenges of mining and geology engineering. Our services in geological and mining department are:
- Economic studies, design and production planning in mining operation
- Services for exploration, geology and resource estimates
- Management, Planning and HSE
- Preparing topographical and geological maps at various scales
- Prepare a comprehensive information system in GIS environment
- Engineering services and supervision
- Geotechnical engineering services
- Feasibility studies, preparation of technical and economical plans

Details:

The goals of this project are as below:

Contract negotiations with internal and external consultants and contractors in project 1
Evaluation of technical and contractual documents of domestic and international bidders and report the results to the client
supervision on all corporate commitment of Technoprom Export Company
Obtaining the necessary permits and follow the relevant authorities, and participate in relevant meetings including technical and legal ones
Preparation of contract documents in supplementary water supply engineering services with contractors and supervision of its implementation in Tabas
Preparation of tender documents for engineering services and environmental studies in Mazino 1 mine and Tabas power plant
Preparation of contract documents for drilling and engineering services for further exploration drilling
Estimation of the water requirements and the annual average to use in the mine and the power plant in peak time
Collecting and processing all the information needed to equip the mine and the power plant and review the distribution of temperature
Estimation of investment and utilization cost of coal transportation from the mine to the power plant
Economic calculations based on technical information provided by the contractors and the environment to determine the cost of coal per ton
Providing supervision of exploration services of the contractors
Providing a comprehensive schedule
Preparation of final report