Site Supervision on Daran-damaneh 63kV Transmission Line


Title: Site Supervision on Daran-damaneh 63kV Transmission Line
Start Date: 2012
End Date: 2013
Client: Esfahan Regional Electric Company
Main Client: Esfahan Regional Electric Company
Location: Daran
Scope Of Work:
This activity covers the several aspects and operations which are necessary to complete the transmission line:
- Basic Design & Detail Design of transmission line
- Construction and Site Supervision
- Supervision of Foundation Erection
- Supervision of Tower Steelwork Erection
- Supervision of Conductor Stringing
- Prepare Monthly Progress Report
- Attend in monthly meeting
- Receiving AS built document
- Attend in PAC meeting
Details:
Noticeable importance of erection of Daran-Damaneh 63kV Transmission Line is transmission electric power from Daran 400kV substation to Daran & Damaneh 63kV substations.

The length of this transmission line is about 14 km. 4 km of this transmission line is constructing Q/C.