Top-Supervision, Monitoring of Techno-Economic Feasibility Study and related Works of Consulting Firm and selection of Terminal Developer or Any other Designated E


Start date: 2017

Finish Date: 2021

Locatin: Bangladesh, Dhaka

Client: RPGCL (Rupantarita Prakritik Gas Company Limited)

First level consultancy: Tokyo Gas – Japon

Second level consultancy: Monenco Iran Consulting Engineer

Capacity: 2* 7.5 MTPA @ Capacity 1000 MMSCFD, Land Based Terminals

Capacity: 2*3.75 MTPA @ Capacity 500 MMSCFD, FSRU plants

 

Scope of Work:

Top-Supervision, Monitoring of Techno-Economic Feasibility Study and related Works of Consulting Firm (Appointed by LNG Cell, Petrobangla) and selection of Terminal Developer or Any other Designated Entity for Construction of land based LNG Terminals at Moheshkhali , Kutubdia of Cox’s-Bazaar and Payra of Patuakhali of Bangladesh

 

Description:

Natural gas is the only indigenous commercial energy resource in Bangladesh. Natural gas currently accounts for 72% of the commercial needs. Most of the natural gas is used in generation of electricity and production of urea fertilizer, with significant uses in industrial, commercial and domestic purpose as well as fuel for CNG operated vehicles. Gas demand is increasing sharply keeping pace with the economic development and diversified use of gas. In Bangladesh gas reserve is not increasing.

Presently there is gas shortage in Bangladesh resulting less power generation, low gas pressure and no new gas connection in industrial, captive and CNG sector impeded in whole gas pipeline network areas. To meet up the upcoming energy supply challenge, Government of Bangladesh has planned to construction of land based LNG re-gasification terminals at Moheshkhali and Kutubdia under COX’s Bazar district and Payra under Patuakhali district each having 7.5 MTPA@ capacity 1000 MMSCFD.