Signing the Contract of “Review of Passive Defense and Cyber Security Requirements of NWAOC-ERDC Building and SCADA Systems”

Signing the Contract of “Review of Passive Defense and Cyber Security Requirements of NWAOC-ERDC Building and SCADA Systems”

 Monenco Iran has recently signed a contract of “Review of Passive Defense and Cyber Security Requirements of NWAOC-ERDC Building and SCADA Systems. The client is Azerbaijan Regional Electric Co.

NWAOC-ERDC building has been constructed in Tabriz. However, it is required to verify if the National Building Codes (Passive Defense requirements) and operational requirements have been met. Therefore, it is necessary to review the following factors related to the building such architecture, structure, mechanical and electrical installations, entries, diesel room and etc. In addition to observe the existing systems such as SCADA hardware, software, firewalls, switches, demilitarized zones, access control policies and etc. to ensure thet Cyber Security requirements of SCADA systems have been met.