On 23/10/2017, 132/33 kV Suwaiq Grid Station energized successfully to be part of Oman Electricity Transmission Company (OETC) network. The Grid Station has been connected to the transmission network through overhead lines.
This project made to meet the load demand and increase the network reliability.
In this project, Monenco Consulting Engineers was responsible for consultancy, design and supervision.