The main activities of this project are Literature survey of methane collecting systems during maintenance of pipelines, Technical investigation of selected methods (determining capacity of each system, waste gas and purged gas in each system and comparison of systems) and proposing the optimum method, and finally conducting economical analysis for proposed system. Project was finished in November 2014.