Synchronous Interconnection of Iran-Iraq Grids


Title: Synchronous Interconnection of Iran-Iraq Grids
Start Date: 2013
End Date: 2015
Client: Electricity Ministry of Iraq
Location: Iraq
Details:

Following the plan of developing an interconnected electrical network in Iran, it is time to investigate options concerning connection to neighboring countries. So, it is decided to conduct a comprehensive study regarding integration and synchronization of Iranian network to Iraqi power grid. In this project, by means of internal and global experiences of networks integration, a feasibility study about interconnection and synchronization of Iranian and Iraqi electrical networks will be performed and all strength and weakness points along with advantages and disadvantages of the plan will be investigated through an inclusive study from different technical, economical points of view".