Comprehensive Study Plan of Power Supply for Emam Khomeini International Airport Project


Title: Comprehensive Study Plan of Power Supply for Emam Khomeini International Airport Project 
Start Date: 2011
End Date: 2012 
Client: Sahne Boostan Consulting Engineers
Main Client: Ministry of Roads & Urban Development 
Location: Tehran- Emam Khomeini Airport 
Scope Of Work: Scope Of Work:
 Evaluation of Existing Power Supply Situation of Intl. Imam Khomeini Airport
 Evaluation of Existing Power Supply System (Including Single Line Diagram, Calculation & Network Parameters)
 Demand Estimation for Flight Zone
 Fligth Zone Load Forecast for Ahead Years
 Study of Feasible Alternatives for Power Supply System Regards to Demand
 Study Of Two Major Airport Site Power Supply- Full Story
 Selection of The Best Alternative for Power Supply System of IKIA
 Study of Connection to Existing Network
 Geotechnical Study Report
 Distributed Generation Different Technologies Feasibility Study, Regard to System Situation,
 Evaluation of DG Optimal Operation Mode (Electricity Tracking or Heat Tracking)
 Tender Documents For Selected Alternative
Details:

Project importance:
In considering the approach to infrastructure for the IKIA Airport site there are several important contextual factors that must be kept in mind, relating to the location of the site, the size and scale of development, the projected population, the unique characteristics of the program and the surrounding landscape and developments. These all influence the selection of an appropriate network structure & Prepare its Power electrical Demand that in this Project it will be distinguished.