Engineering Service & Supervision On Replacement of 27km Oil Embraced 63kv Cable to XLPE


Title: Engineering Service & Supervision On Replacement of 27km Oil Embraced 63kv Cable to XLPE
Start Date: 2010
End Date: 2012
Client: Tehran Regional Electrical Company (TREC)
Main Client: Tehran Regional Electrical Company (TREC)
Location: Tehran- Route through substations
Scope Of Work:
Engineering services and supreme supervisory that include :
- Preparation of technical specification of tender documents
- Basic Design
- Detail Design
- Concept Design
- Contractors and proposals Evaluation
- Bid Evaluation & cooperation with Client for signing contract
- Site supervision

Details:
Due to exhaustion of Oil Filled Cables Connecting Subtransmission Network Throughout The City of Tehran And Tehran Regional Electrical Company Policy for Replacement of Oil Filled cable to XLPE, This Purpose Is Going to be Done In Some Cable Routes Among Some 63kv Substations Such as SHAHID FIROOZI-SHAHID KALANTARI, SHAHID FIROOZI-AZARBAYJAN, AZADEGAN- AZARI & AZADEGAN –JEIHOON by 2 and 3 Circuits that Besides Reconstruction of The Network Causes the Capacity increasement Among These Substations.