Monenco Iran, Mapna Power Plants Construction & Development Co (MD1). and Nasb Niroo joined together and won a tender of “Modification of Second Unit of Hamedan Power Plant Cooling System” through EPC method. The client is Thermal Power Plants Holding Company.
Monenco Iran, as one of the joined members, is responsible to render engineering services including basic design, detail design and equipment purchase engineering.
In this project, water consumption will be reduced through converting the existing Heller cooling system tower with water spraying technology into a combined Heller tower. This matter causes the reduction of the amount of using nearby water sources as well.